Piping

FRONT END ENGINEERING DESIGN (FEED)
    • Planning and Control
    • Piping General Specification
    • Material Specifications
    • Painting and Insulation Specifications
    • Plant Layout and Plot Planning
    • Conceptual Piping Layout
    • FEED 3D Models
    • BM/BQ Estimation
    • Site Survey
DETAILED ENGINEERING DESIGN PHASE
    • Planning and Control
    • Piping General Specification
    • Piping Material Specifications
    • Plot Planning
    • Piping Layout and 3D Models
    • Pipe Support Standard
    • Piping Stress Analysis
    • 3D Database Administration and Control
    • Technical Specification, Data Sheets and Requisition
    • Piping Material Take-Off
    • Piping Plan and Isometric Drawings
    • Steam Trace Layout
    • Painting and Insulation Specifications

Engineering Tools

    • Plant Design Application – PDS, PDMS, S3D, and AutoCAD Plant 3D
    • Stress Analysis – CAESAR II and AutoPIPE
    • Design Review – SPR and Navisworks
    • Material System – MACS

Code and Standards

    • ASME, ANSI, API, NFPA, IP, ISO, OSHA
PROCUREMENT PHASE
    • Technical Bid Evaluation
    • Vendor Document Review
CONSTRUCTION PHASE
    • Field Engineering
    • Construction Supervision
    • Fabrication Drawing Review
    • Preparation and Review of Test Packages
    • Assist Pre-Commissioning Works

As-built Works

      • Plan and Isometric Drawings
      • 3D Model
      • Calculation Sheets